This is a limited public sample, not the full member feed. Check each source for current documents and changes. The filters below become available when the workspace finishes loading.
Public bid
Springfield β Troop D Headquarters HVAC and Controls Upgrade
Upgrade the HVAC system and associated controls serving the two-story Missouri State Highway Patrol Troop D headquarters.
Bids due 2026-11-05 at 1:30 p.m. (Missouri local time); email submission only
Open the original sourcePublic bid
Moberly β Correctional Center Kitchen Renovation
Replace steam-kettle and dish-cleaning equipment, install quarry-tile flooring and stainless wet-wall protection, relocate ovens beneath existing hoods, and replace interior/exterior doors in kind.
2026-11-10 at 1:30 PM Missouri local time; electronic receipt to FMDCBids@oa.mo.gov
Open the original sourceApproved development
Kansas City β CPKC Stadium Expansion / Berkley Riverfront Mixed-Use Infrastructure
Kansas City passed agreements tied to infrastructure design and construction, the CPKC Stadium expansion, mixed-use development, parking structures and related core infrastructure on September 10, 2026. This is a development signal, not an open construction bid.
Agreements passed Sept. 10, 2026 β’ pre-procurement
Open the original sourceApproved development
Kansas City β 55-Acre Hospital Campus Development Plan
Kansas City approved a preliminary development plan covering roughly 55 acres between E. 20th and E. 25th Streets for public/civic uses identified as a hospital campus.
Plan approved July 9
Open the original sourcePublic bid
Ava β Bryant Creek State Park Potable Water Systems
Provide potable water for two day-use areas, including wells, wellhouses, pressure tanks, chlorination, piping and yard hydrants.
Bids due 2026-10-22 at 1:30 p.m. (Missouri local time); email submission only
Open the original sourcePrivate construction information β available packages unverified
Creve Coeur β Olia Village Lot 1 Retail + Parking Structure
Olia Village Lot 1 includes a grocery store, retail building and shared parking structure. The city reports the grocery core-and-shell permit issued and construction underway, with retail-building and parking-structure permits expected soon.
Grocery shell construction reported; other package timing unverified
Open the original source