Missouri opportunity feed

What deserves your attention first β€” not a dump of raw permits.

SOURCE MONITOR β€’ MISSOURI
16limited public opportunity set β€’ full feed protected
14priority score 90+
4open / public bid signals
5early signals
6approved developments
PUBLIC VIEW: this is the real member workspace using a limited public view. The protected statewide feed is not exposed. What a buyer is paying for: one filtered queue tied to their trade and territory. Every item retains the government source so the contractor can verify details before bidding or prospecting.
Want the broader Missouri working feed?Radar plans start at $4.99/month for one trade and region. Pro provides statewide access. Compare plans to choose the coverage and tools you need. No required sales call.
Subscribe to Radar β†’

⚑ Morning Brief

Radar distills the feed into the few things worth checking first for your saved territory and trade.

0 unseen
Best match
β€”
Closing soon
β€”
Early signal
β€”
Approved development
β€”
Unseen high priority
β€”
β€” Set a trade/territory once and Radar remembers it on this device.

Selected Missouri project examples

This is a limited public sample, not the full member feed. Check each source for current documents and changes. The filters below become available when the workspace finishes loading.

Public bid

Springfield β€” Troop D Headquarters HVAC and Controls Upgrade

Upgrade the HVAC system and associated controls serving the two-story Missouri State Highway Patrol Troop D headquarters.

Bids due 2026-11-05 at 1:30 p.m. (Missouri local time); email submission only

Open the original source
Public bid

Moberly β€” Correctional Center Kitchen Renovation

Replace steam-kettle and dish-cleaning equipment, install quarry-tile flooring and stainless wet-wall protection, relocate ovens beneath existing hoods, and replace interior/exterior doors in kind.

2026-11-10 at 1:30 PM Missouri local time; electronic receipt to FMDCBids@oa.mo.gov

Open the original source
Approved development

Kansas City β€” CPKC Stadium Expansion / Berkley Riverfront Mixed-Use Infrastructure

Kansas City passed agreements tied to infrastructure design and construction, the CPKC Stadium expansion, mixed-use development, parking structures and related core infrastructure on September 10, 2026. This is a development signal, not an open construction bid.

Agreements passed Sept. 10, 2026 β€’ pre-procurement

Open the original source
Approved development

Kansas City β€” 55-Acre Hospital Campus Development Plan

Kansas City approved a preliminary development plan covering roughly 55 acres between E. 20th and E. 25th Streets for public/civic uses identified as a hospital campus.

Plan approved July 9

Open the original source
Public bid

Ava β€” Bryant Creek State Park Potable Water Systems

Provide potable water for two day-use areas, including wells, wellhouses, pressure tanks, chlorination, piping and yard hydrants.

Bids due 2026-10-22 at 1:30 p.m. (Missouri local time); email submission only

Open the original source
Private construction information β€” available packages unverified

Creve Coeur β€” Olia Village Lot 1 Retail + Parking Structure

Olia Village Lot 1 includes a grocery store, retail building and shared parking structure. The city reports the grocery core-and-shell permit issued and construction underway, with retail-building and parking-structure permits expected soon.

Grocery shell construction reported; other package timing unverified

Open the original source