Showing 5 current records from Radar's approved public sample. Formal bids and earlier or related project signals are labeled separately; this is not the complete member feed.
Approved developmentConcrete project
Columbia — Theory Sterling University Up-to-320-Unit Development
Columbia · Central Missouri
Columbia enacted the planned development at 1205 University Avenue for Theory Sterling University. The approved plan allows up to 320 dwelling units on about 2.91 acres near the University of Missouri.
- Public milestone
- Development enacted Aug. 3, 2026
- Trade relevance
- Potential fit: demolition, high-density multifamily GC, concrete, structural, roofing, elevators, HVAC, electrical, plumbing, fire protection, interiors, glazing and suppliers.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open concrete bid. Confirm package scope, project team and procurement route before pricing.
Open official sourceActive constructionConcrete project
Creve Coeur — Olia Village Lot 1 Retail + Parking Structure
Creve Coeur · St. Louis area
Olia Village Lot 1 includes a grocery store, retail building and shared parking structure. The city reports the grocery core-and-shell permit issued and construction underway, with retail-building and parking-structure permits expected soon.
- Public milestone
- Grocery shell construction reported; other package timing unverified
- Trade relevance
- Strong fit: retail GC, parking-structure concrete, steel, MEP, fire protection, roofing, storefront/glazing, paving, striping, signage, low voltage, landscaping and material/equipment suppliers.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open concrete bid. Confirm package scope, project team and procurement route before pricing.
Open official sourceApproved developmentConcrete project
Kansas City — 55-Acre Hospital Campus Development Plan
Kansas City · Kansas City area
Kansas City approved a preliminary development plan covering roughly 55 acres between E. 20th and E. 25th Streets for public/civic uses identified as a hospital campus.
- Public milestone
- Plan approved July 9
- Trade relevance
- Potential fit: healthcare/general contracting, structural, concrete, HVAC/mechanical, electrical, plumbing, med-gas, fire protection, low-voltage, roofing, interiors, sitework and suppliers.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open concrete bid. Confirm package scope, project team and procurement route before pricing.
Open official sourceApproved developmentConcrete project
Kansas City — CPKC Stadium Expansion / Berkley Riverfront Mixed-Use Infrastructure
Kansas City · Kansas City area
Kansas City passed agreements tied to infrastructure design and construction, the CPKC Stadium expansion, mixed-use development, parking structures and related core infrastructure on September 10, 2026. This is a development signal, not an open construction bid.
- Public milestone
- Agreements passed Sept. 10, 2026 • pre-procurement
- Trade relevance
- Research fit: major civil/sitework, structured parking, utilities, concrete/steel, electrical, mechanical, stadium/mixed-use trades and suppliers. Legislative/development signal, not presented as an open bid.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open concrete bid. Confirm package scope, project team and procurement route before pricing.
Open official source