Public bidFormal bid
Moberly — Correctional Center Kitchen Renovation
Moberly · North Missouri
Replace steam-kettle and dish-cleaning equipment, install quarry-tile flooring and stainless wet-wall protection, relocate ovens beneath existing hoods, and replace interior/exterior doors in kind.
- Bid / response
- 2026-11-10 at 1:30 PM Missouri local time; electronic receipt to FMDCBids@oa.mo.gov
- Trade relevance
- Evidence-supported fit: general_contracting, flooring, doors_windows, supplier, plumbing, hvac, electrical, painting. Project manual divisions 22/23/26 establish plumbing piping/equipment/fixtures, hydronic/gas piping, boilers/ducts and electrical...
- Source evidence
- Checked Sep 28, 2026
Open official sourceApproved developmentElectrical project
Columbia — Theory Sterling University Up-to-320-Unit Development
Columbia · Central Missouri
Columbia enacted the planned development at 1205 University Avenue for Theory Sterling University. The approved plan allows up to 320 dwelling units on about 2.91 acres near the University of Missouri.
- Public milestone
- Development enacted Aug. 3, 2026
- Trade relevance
- Potential fit: demolition, high-density multifamily GC, concrete, structural, roofing, elevators, HVAC, electrical, plumbing, fire protection, interiors, glazing and suppliers.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open electrical bid. Confirm package scope, project team and procurement route before pricing.
Open official sourceActive constructionElectrical project
Creve Coeur — Olia Village Lot 1 Retail + Parking Structure
Creve Coeur · St. Louis area
Olia Village Lot 1 includes a grocery store, retail building and shared parking structure. The city reports the grocery core-and-shell permit issued and construction underway, with retail-building and parking-structure permits expected soon.
- Public milestone
- Grocery shell construction reported; other package timing unverified
- Trade relevance
- Strong fit: retail GC, parking-structure concrete, steel, MEP, fire protection, roofing, storefront/glazing, paving, striping, signage, low voltage, landscaping and material/equipment suppliers.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open electrical bid. Confirm package scope, project team and procurement route before pricing.
Open official sourceApproved developmentElectrical project
Kansas City — 55-Acre Hospital Campus Development Plan
Kansas City · Kansas City area
Kansas City approved a preliminary development plan covering roughly 55 acres between E. 20th and E. 25th Streets for public/civic uses identified as a hospital campus.
- Public milestone
- Plan approved July 9
- Trade relevance
- Potential fit: healthcare/general contracting, structural, concrete, HVAC/mechanical, electrical, plumbing, med-gas, fire protection, low-voltage, roofing, interiors, sitework and suppliers.
- Source evidence
- Checked Sep 13, 2026
Not presented as an open electrical bid. Confirm package scope, project team and procurement route before pricing.
Open official source